Carillion, Greenwood Academy, Castle Vale, Birmingham

b956a11b-37c5-49df-aa21-f406c338a8f5-original
IMG_0105
IMG_0091
15072110-8b52-43a9-b6cc-08a6770bd665-original

We are in the process of completing the construction of a brand-new academy in Castle Vale Birmingham as part of the PF2 Midlands scheme, for Carillion building limited.

The construction of the new academy involved:

  • A major earthworks operation to remove contaminated material from the old Spitfire factory that was on the site.

  • The construction of a large raft foundation with over 1000m3 of concrete in, one pour alone consisted of over 600m3.

  • Drainage works incorporating a large attenuation crate system

  • A new multiuse games area.

  • The foundations and associated works for a new sports centre and energy centre.