Galliford Try, Stanton Cross, Wellingborough
![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() |
We are working on the Stanton Cross Wellingborough infrastructure development for Galliford Try.
To date we have been awarded:
The 470m diversion of the river Ise which involves;
-
280m of offline works including scour protection for the new footbridge abutments
-
The installation of tens of thousands of the Envirolok bags and hundreds of square metres coir matting to prevent scouring of the new water course and around the new structures.
-
Temporary works including the installation of A frame dams, electro fish netting and over pumping of the river.
-
190m of online works including works around the new road bridge.
278 Works to Irthlingborough road which includes;
-
400m of new road & footpath construction
-
Traffic management during a 15-week road closure
Route 4 Works which includes
-
The installation of new foul and sewer drainage
-
Construction of new road and adjacent footpaths